Completed Projects

  1. 2015 CH Overlay Projects

    View several of the overlay highway projects within Scott County for 2015.

    Link to page
  2. CH 101 Overlay

    Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.

    Link to page
  3. 2016 Overlay Projects

    This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.

    Link to page
  4. CH 1 Flood Recovery

    Learn about the construction taking place on County highway 1 that is aimed at dealing with Flood Recovery.

    Link to page
  5. CH 2 Overlay

    Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.

    Link to page
  6. CH 6 Flood Recovery

    Scott County experienced historic rainfalls on June 19, 2014 which caused extensive flooding throughout the county, primarily in the Minnesota River Valley. County Highway (CH) 6, in Blakeley Township, was among a list of roads that were closed due to several mudslides.

    Link to page
  7. CH 8 Overlay

    Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.

    Link to page
  8. CH 9 Overlay

    Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.

    Link to page
  9. CH 10 Overlay

    Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.

    Link to page
  10. CH 15 Overlay

    Link to page
  11. CH 12 Reconstruction

    This project will improve safety by removing access and installing turn lanes along westerly segment.

    Link to page
  12. CH 17 Reconstruction

    The purpose of this project is to increase safety and capacity of this segment of highway through lane expansion, intersection modifications, and access closures.

    Link to page
  13. CH 27 Culvert Replacement

    Link to page
  14. CH 44 Reconstruction Phase 2

    Phase II of CH 44 Reconstruction Project, will reconstruct the eastbound lanes to complete a four-lane urban roadway with channelization at major intersections.

    Link to page
  15. CH 59 Culvert Replacement

    Link to page
  16. CH 64 Culvert Replacement

    Link to page
  17. CH 68 Culvert Replacements

    Culvert Replacements on County Highway 68 in Credit River Township.

    Link to page
  18. CH 79 Culvert Replacement

    Link to page
  19. CH 79 & Vierling Drive Mini-Roundabout

    Analysis showed that a mini-roundabout at this intersection will provide an operational benefit and decrease delays.

    Link to page
  20. CH 101 Bridge Maintenance

    CH 101 over Minnesota River and Levee Drive

    Link to page
  21. CH 101 Trail Connection

    This project completes a significant gap in the trail system along the Minnesota River.

    Link to page
  22. Highway 101/61 Southwest Reconnection Project

    Scott County Highway 101 between existing Minnesota River bridge in Shakopee and Carver County Hwy 61/Flying Cloud Drive in Chanhassen

    Link to page
  23. 2016 HSIP Shoulder Widening

    The 2016 Highway Safety Improvement Program (HSIP) Shoulder Widening project is designed to improve highway safety and increase performance on numerous roadways throughout Scott County.

    Link to page