Closure of CH 51 will begin on Monday, August 27th. Advanced notice signs are in place.
Project Details
Replaces culverts to address continuing erosion stabilization problems along the right-of-way on CH 51 (between CH 1 and gravel portion) and CH 53 (1/2 mile south of TH 169).