2021 CSAH 42 Pavement Rehabilitation

  • Construction Year: 2021
  • Community: City of Savage
  • Corridor Served: CSAH 42
  • Project Lead: Scott County
  • Contractor: Bituminous Roadways
  • Start Date: June 14, 2021

Traffic Impacts:


Expect traffic impacts with lane closures starting Monday, June 14, 2021. Traffic will be reduced to one lane in each direction but will remain open to the public. Alternate routes through the area is advised. Access to side streets off County Road 42 between Louisiana and Huntington will remain open. Please note, residents in this corridor may experience delays as work connecting these side streets to the County Road 42 reconstruction. Traffic conditions will be in this configuration through the end of August, 2021.
 

​Project Updates:

Friday, July 2, 2021: County Road 42 down to one lane each direction from Huntington to Louisiana. Expect major relays.  

Thursday, July 22, 2021: Traffic has been moved to the outside lanes to allow for improvements to the median areas. Be advised in August, paving operations will begin and traffic control configurations will change daily as the through lanes are milled and paved.

Friday, July 30, 2021: Paving operations will begin next week. Traffic should expect delays. 

Description:


This project encompasses the Eastern most 2-mile section of CSAH 42, from Louisiana Avenue to the border of Dakota County, in the City of Savage. This section of CSAH 42 was last overlaid with various projects from 2008 to 2011. This section sees the highest traffic volume in Scott County.

Work includes a 4 inch mill and overlay, turn lane modifications, storm sewer structure repair, sealcoating, ADA retrofits, sign replacements, and City of Savage utility repair. 
  

Purpose & Justification:


Annually. Scott County reviews its roadways and determines priority for pavement preservation. Keeping pavements in good repair and preserving the significant investment in the County's highway system is a high priority. Each corridor is evaluated for factors affecting the pavement to determine the most cost effective approach to pavement rehabilitation. As a part of our comprehensive maintenance approach, these pavement projects also include American Disabilities Act (ADA) trail ramp retrofits, and sign and post replacement work to bring these roadway features up to current standards. Sealcoating is included for each project.
42-22 Map