2023 Overlays
Project Details
- Construction Year: 2023
- Community: Throughout Scott County
- Project Lead: Scott County
- Contractor: Valley Paving Inc.
- Anticipated Completion Date: Fall 2023
Overlay Project (Updated 03/13/23)
CH 03: Between TH 19 and TH 169
- Location: Belle Plaine
- Work Description: Work includes removing the top 4 inches of bituminous, paving the top 4 inches with new bituminous, seal coating, and sign replacement.
CH 03: Between TH 169 and 400 South of Main Street
- Location: Belle Plaine
- Work Description: Work includes removing the top 2 inches of bituminous, utility replacement, paving the top 2 inches with new bituminous, seal coating, ADA retrofits, and sign replacement.
CH 04: Between CH 07 and CH 11
- Location: Township of Belle Plaine
- Work Description: Work includes removing the top 4 inches of bituminous, paving the top 4 inches with new bituminous, seal coating, and sign replacement.
CH 07: Between TH 19 and CH 05
- Location: Township of Belle Plaine
- Work Description: Work includes removing all existing bituminous, aggregate base cement stabilization, paving with 5 inches of new bituminous, sealcoating and sign replacement.
CH 02: Intersection of CH 02 and Cedar Lane
- Location: Townships of Helena and Cedar lake
- Work Description: Adding left and right turn lanes.
CH 16: 2,600 Feet West of CH 83 to CH 83
- Location: Shakopee
- Work Description: Work includes removing the top 3 inches of bituminous, utility replacement, paving the top 3 inches with new bituminous, seal coating, and sign replacement.
CH 27: Between CH 86 and CH 02
- Location: Township of New Market
- Work Description: Work includes removing all existing bituminous, aggregate base cement stabilization, paving with 5 inches of new bituminous, sealcoating and sign replacement. The portion that was reconstructed in 2009 will only receive a 3 inch mill and overlay.
CH 83: Between CH 16 and TH 169 South Ramp
- Location: Shakopee
- Work Description: Work includes removing the top 4 inches of bituminous, utility replacement, paving the top 4 inches with new bituminous, seal coating, ADA retrofits, and sign replacement.
CH 83: 430 Feet South of Wilds Path to CH 42
- Location: Prior Lake
- Work Description: Work includes removing the top 5 inches of bituminous, utility replacement, paving the top 5 inches with new bituminous, seal coating, and sign replacement.
CH 91: Between CH 02 and CH 08
- Location: Township of New Market
- Work Description: Work includes removing all existing bituminous, aggregate base cement stabilization, paving with 5 inches of new bituminous, sealcoating and sign replacement.
Purpose & Justification
This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements. Please drive with caution.
-