Great Plains Sand Mining EAW

Review Report

  1. Approved Findings of Fact and Conclusions for Great Plains Sand EAW (PDF)
  2. Approved Response to Comments for Great Plains Sand EAW (PDF)
  3. Exhibit 1 - Hydrologic Analysis (PDF)
  4. Exhibit 2 - Ground Water Modeling (PDF)
  5. Exhibit 3 - DNR Natural Heritage Review (PDF)
  6. Exhibit 4 - Biological Survey (PDF)
  7. Exhibit 5 - Soil Balance of Reclamation Summary (PDF)
  8. Exhibit 6 - Ground Water Monitoring Plan (PDF)
  9. Exhibit 7 - Noise Assessment (PDF)
  10. Exhibit 8 - State Historical Preservation Office (PDF)
  11. Exhibit 9 - Views from Park (PDF)
  12. Figure 01 - General County Location (PDF)
  13. Figure 02 - USGS Quad (PDF)
  14. Figure 03 - Site Plan (PDF)
  15. Figure 04 - Site Ownership (PDF)
  16. Figure 05 - Phase 1 (PDF)
  17. Figure 05 - Phase 2 (PDF)
  18. Figure 05 - Phase 3 (PDF)
  19. Figure 05 - Phase 4 (PDF)
  20. Figure 06 - Typical Section (PDF)
  21. Figure 07 - Zoning Map (PDF)
  22. Figure 08 - Aerial Photo (PDF)
  23. Figure 09 - NWI Map (PDF)
  24. Figure 10 - PWI Map (PDF)
  25. Figure 11 - Area Well Locations (PDF)
  26. Figure 12 - Shoreland District Map (PDF)
  27. Figure 13 - FEMA Map (PDF)
  28. Figure 14 - Soils Map (PDF)
  29. Figure 15 - Archaeological Site (PDF)
  30. Final Groundwater Model Exhibit (PDF)
  31. Great Plains Sands NonMetallic Mineral Mining Operation EAW (PDF)
  32. Map A - Existing Conditions (PDF)
  33. Map B - Proposed Operations (PDF)
  34. Map C - Reclamation Plan (PDF)
  35. Map D - End Use Plan (PDF)
  36. Negative Declaration for EIS (PDF)
  37. Proposed Blasting Monitoring Plan for IUP (PDF)
  38. Proposed Fugitive Dust Control Plan for IUP (PDF)
  39. Proposed Groundwater and Surface Water Monitoring and Mitigation Plan for IUP (PDF)
  40. Proposed Reclamation Geotechnical Report for IUP (PDF)